Products
Flat Head Chamfer Playing Center Hole Machine Tool
Both ends at the same time to complete the center hole, flat head, and chamfer, fast and accurate. Can automatically load and unload. The center line of the machining parts and the cutting plate is accurate and unchanged. When the cutting plate is specially designed, the blade is standardized, and the adjustment blade is simple and fast.
Features of flat head chamfer playing center hole machine tool:
Both ends at the same time to complete the center hole, flat head, and chamfer, fast and accurate. Can automatically load and unload. The center line of the machining parts and the cutting plate is accurate and unchanged. When the cutting plate is specially designed, the blade is standardized, and the adjustment blade is simple and fast. PLC control, automatic feeding, automatic clamping, and automatic advance and retreat knife on both ends at the same time to ensure length and accuracy. Fast speed, high efficiency. It is mainly suitable for chamfering of shaft products, removing burrs, making flat end surfaces, and making center holes.The use of machine chamfering is the development trend of the mechanical industry. The chamfering machine, to overcome the processing shortcomings of mechanical and electric tools, has the advantages of being convenient, fast, and accurate and is the best choice of axis products for chamfering flat heads.
Product Parameter:
| model | TPD-2040 |
| working pressure | 4-8 MPa |
| Processing diameter | Φ20-40mm |
| Processing length | 280-2200mm |
| working accuracy | ±0.1 mm |
| control method | PLC |
Finished product:

Related Products
Technical Support
R&D Strength
Quality Assurance
Manufacturing Process
High Durability And High Efficiency
Precision Machining And Customization
Comprehensive Technical Support
Comprehensive After-Sales Guarantee
FAQ
Yes, it is ok. Our Samples are free for the customers. But the freight for express is on buyer's account.
After you pay the freight charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3~5 days.
Yes, it is ok. But the quantity of each ordered item should reach the MOQ for trail order.
A. For inventory products, we will send goods to you within 7-10 work days after we receive the deposit.
B. For mass production, the delivery time is 25-28 days after we received the deposit
C.For OEM products, the delivery time is 30-35 work days after we receive the deposit.
T/T 30% advanced before production,70% balance payment before delivery.
We will help you to choose the best shipping way according to your detail requirements.
By sea, by air, or by express delivery, etc.
After you pay the freight charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 5~7 days.
Normally packed with wooden drums and cartons, other ways can be done according you.








