Products
Roller Double End Carbon Dioxide Arc Welding Machine
The machine adopts CO₂Ar or CO₂Ar Ar or CO₂O₂ as the protective gas of welding or the protective welding method of using flux-cored wire CO₂.. The welding strength is high, the center is automatically adjusted, and the welding is at the same time. The pneumatic clamping can complete the hydraulic cylinder, firefighting equipment, roller, etc. In particular, the control system based on the imported programmable controller (PLC) is adopted to replace the traditional relay logic control circuit to make the equipment reliable. The scope of application and work efficiency have been greatly improved.
This equipment has two models, TH-160*2200 and TH-220*2200. Please consult for details.
Product use and scope of application:
The roller double end carbon dioxide arc welding machine adopts CO₂Ar or CO₂Ar Ar or CO₂O₂ as the protective gas for welding or the protective welding method of using flux-cored wire CO₂. The welding strength is high, the center is automatically adjusted, and the welding is at the same time. The pneumatic clamping can complete the hydraulic cylinder, firefighting equipment, roller, etc. In particular, the control system based on the imported programmable controller (PLC) is adopted to replace the traditional relay logic control circuit to make the equipment reliable. The scope of application and work efficiency have been greatly improved.
Technical parameters:
| project | parameter |
| model | TH-220*2200 |
| Machine tool center height | 850 mm |
| Welding workpiece length | 200-2200mm |
| Welding workpiece diameter | Ф76-Ф219mm |
| welding current | 60-350A (350KR) |
| floating voltage | 45-55V (350KR) |
| rated capacity | 50 KVA (350 KR) |
| shield gas flow rate | 10-25 L/min |
| Weldable workpiece length | 200-2200mm |
| Welding rotation speed | 0-10 rpm/min |
| outline dimension | 3800x500x1150 |
| weight | 1500 kg |
Finished product:

Related Products
Technical Support
R&D Strength
Quality Assurance
Manufacturing Process
High Durability And High Efficiency
Precision Machining And Customization
Comprehensive Technical Support
Comprehensive After-Sales Guarantee
FAQ
Yes, it is ok. Our Samples are free for the customers. But the freight for express is on buyer's account.
After you pay the freight charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3~5 days.
Yes, it is ok. But the quantity of each ordered item should reach the MOQ for trail order.
A. For inventory products, we will send goods to you within 7-10 work days after we receive the deposit.
B. For mass production, the delivery time is 25-28 days after we received the deposit
C.For OEM products, the delivery time is 30-35 work days after we receive the deposit.
T/T 30% advanced before production,70% balance payment before delivery.
We will help you to choose the best shipping way according to your detail requirements.
By sea, by air, or by express delivery, etc.
After you pay the freight charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 5~7 days.
Normally packed with wooden drums and cartons, other ways can be done according you.








