Products
Parallel Roller
Parallel rollers are divided into upper rollers and lower rollers, which are used to support and guide the conveyor belt. Common models include 89*600*640, 108*1150*1200, etc. The numbers represent the diameter, length, and other dimensions of the rollers (unit: mm).
Parallel rollers are divided into upper rollers and lower rollers, which are used to support and guide the conveyor belt. Common models include 89*600*640, 108*1150*1200, etc. The numbers represent the diameter, length, and other dimensions of the rollers (unit: mm).
Product Parameters:
| Parameter classification | Detailed parameters |
| Model | Ф89×600, Ф89×750, Ф89×950 (bandwidth 500-950mm) |
| Ф108×600, Ф108×1150, Ф108×1600 (bandwidth 800-1600mm) | |
| Ф133×1600 (bandwidth 1400mm) | |
| Material | Cylinder: Q235 steel, ultra-high molecular polyethylene (UHMWPE), rubber |
| Bearings: large clearance deep groove ball bearings produced in Harbin, Wafangdian, and Luoyang | |
| Dimension parameters | Diameter: 89mm, 108mm, 133mm, 159mm |
| Roller length: 600-1600mm (matched according to bandwidth) | |
| Cylinder skin thickness: 2.0-3.0mm | |
| Technical parameters | Rotational resistance: ≤2.5N |
| Axial movement: ≤0.7mm | |
| Radial runout: ≤0.5mm | |
| Load capacity: ≥20 kN | |
| Sealing structure | Sealing system (inner seal + labyrinth seal + outer seal) |
| Material: Nylon 6 (PA6) + Nitrile rubber (NBR) | |
| Surface treatment | Electrostatic spraying (paint film thickness ≥90 μm) |
| Applicable scenarios | Bulk material transportation (coal, ore) |
| Piece item transportation (boxed goods) |
Related Products
Technical Support
R&D Strength
Quality Assurance
Manufacturing Process
High Durability And High Efficiency
Precision Machining And Customization
Comprehensive Technical Support
Comprehensive After-Sales Guarantee
FAQ
Yes, it is ok. Our Samples are free for the customers. But the freight for express is on buyer's account.
After you pay the freight charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3~5 days.
Yes, it is ok. But the quantity of each ordered item should reach the MOQ for trail order.
A. For inventory products, we will send goods to you within 7-10 work days after we receive the deposit.
B. For mass production, the delivery time is 25-28 days after we received the deposit
C.For OEM products, the delivery time is 30-35 work days after we receive the deposit.
T/T 30% advanced before production,70% balance payment before delivery.
We will help you to choose the best shipping way according to your detail requirements.
By sea, by air, or by express delivery, etc.
After you pay the freight charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 5~7 days.
Normally packed with wooden drums and cartons, other ways can be done according you.







